How do I configure Deferred Delivery in ATRS?

If you need to schedule reports for generation at a specific time but want to deliver them later time, you can easily do so by deferring the delivery. Follow these steps to defer the delivery of your scheduled reports.

Deferring your Reports

Step 1: Navigate to the Destination section within any Schedule, and choose the option labeled Misc. for additional settings.

Step 2: Check the Deferred delivery by box and indicate the length of the delay before delivery.

destination deferred

Viewing Deferred Exports

All exports that have been deferred will be visible in System Monitor, under the Deferred Delivery Tab.

Step 1: Navigate to System Monitor.

ATRS Sytem Monitor

Step 2: Select Deferred Delivery.  Here you will see a comprehensive list and additional details of the reports that have been deferred for delivery.

deferred delivery