CRD Version 7.1 Build 20160713
Enhancements:
-New CRD constant has been added “Scheduled Time”
-Option to preview reports via PDF, including customers using Crystal XI and Crystal XIR2
-New installations of CRD provides an option to connect to an existing CRD database
-When searching, schedules in a package that meet the search criteria will now include the package name
Issues Resolved:
-Fixed issue where certain schedules were getting locked in the queue and not running via the scheduler (also known as thread-locking).
-Fixed issue with schedules running multiple times while multi-threading is enabled
-The ability to change crystal versions now works as expected
-Universal search does not crash when returning a large number of records
-For event based schedules, the "database record has been modified"option being set to false now performs as expected
-Exporting schedules with 256 columns to an ODBC destination works properly with Crystal 2011 runtimes
-Error alerts are only sent once for a schedule, instead of alerting the user on each retry
-CRD retains the version of crystal runtimes selected during a CRD update
-Scheduler works as expected when multi-threading is set to 4
-Single schedules set to ‘Other’ run time, runs as expected
-Dynamic and Data driven schedules that are set to embed the report in emails output data as expected
Thank you all for your feedback and patience while waiting for this release.
For more information about ChristianSteven, visit http://www.christiansteven.com