To put a Microsoft Power BI report into regular use, build and validate it in Desktop, publish it to a team workspace, and test refresh and access in the Power BI service. Then choose how people will get it. Some readers need a live report they can filter. Others need a copy delivered at a set time.
Take a weekly sales report. Regional managers need to explore their own results, while finance needs a Monday morning copy for the close. Start with the same business definitions for both audiences. Then test each way of getting the report separately.
In Power BI Desktop, use Power Query to set data types and clean up the source data. Model the relationships between sales, dates, and regions. Use DAX measures for totals and ratios that should change when a reader filters the report. For example, calculate gross margin percentage as total margin divided by total revenue in the current filter context, so a regional total uses that region’s revenue.
Pick one region and one week and reconcile the results to the source before publishing. If a weekly figure is wrong, check the date relationship and the measure before reformatting the visual. For a hands-on example, follow the first Power BI report walkthrough.
Publish the report and its semantic model to the team workspace. Give the people who maintain the report the workspace access they need. For a wider audience, publish a Power BI app and manage access through its audiences. Check that readers have the required licenses and access to any underlying model in another workspace.
Open the app with a test account set up like a regional manager. If you use row-level security, make sure that manager sees their region and cannot see another one. Testing with a workspace administrator can hide this problem because row-level security does not restrict workspace roles that can edit the model.
For an imported sales model, configure credentials and scheduled refresh in the service. If the service needs a gateway to reach an on-premises source, map the model to the gateway connection. A successful refresh in Desktop is only the first check. In the service, review refresh history and confirm the latest expected reporting period appears in the published report.
If the source closes at 6 a.m. Monday and finance needs a copy by 8 a.m., leave time for loading and refresh. When the source finish time varies, use a delivery process that waits for confirmed refresh completion. If a copy still shows last week’s numbers, check whether it was generated before refresh finished.
The guide to Power BI report scheduling and delivery compares native subscriptions and other automation options.
Use two test recipients and compare what they see in the app with what lands in their inboxes. Record the source cutoff, refresh completion time, delivery time, and expected region. Give one person responsibility for checking both refresh and delivery failures. When the numbers, permissions, and outputs all match, add the real recipient list.
If finance needs a separate copy for each region every Monday, try that same two-recipient test with PBRS, the Power BI report scheduler. Use a data-driven schedule to map each recipient to the right region filter or report parameter. Check both files before adding the rest of the distribution list.